Nada had the opportunity to take a tour on site and walk through some of the apartments, and she was blown away by how amazing they are. the natural light, high ceilings and spacious floor plans are stunning. Block A and B roof slab have been poured, with block C roof slab currently being formed up and is scheduled to be poured on 22 December. Internal wall framing has commenced on terrace level and first floor, and mechanical, plumbing and electrical services rough-in work has commenced on lower levels.